Products
  • Products
  • Suppliers
  • Buyers
  • Exhibitors
Search
Products
  • Products
  • Suppliers
  • Buyers
  • Exhibitors
Search
Products News Exhibitions Exhibitors
China ASME gas steam boiler high efficiency super heater China ASME gas steam boiler high efficiency super heater China ASME gas steam boiler high efficiency super heater

China ASME gas steam boiler high efficiency super heater

FOB Price:
US 2500-2900 / Ton
Min.Order Quantity:
1 Ton/Tons
Supply Ability:
5000 Ton/Tons per Year
Port:
qingdao
Place of Origin:
Shandong, China (Mainland)
Payment Terms:
L/C,D/A,D/P,T/T,Western Union,MoneyGram
Brand:
HTEG
Products Model:
Customized
Share:
  • Products Details
  • Company Profile

Quick Details

  • Brand Name: HTEG

    Model Number: Customized

    Place of Origin: Shandong, China (Mainland)

Packaging & Delivery

  • Packaging Details: Seaworthy package
  • Delivery Detail: Shipped in 3 days after payment

Specifications

China ASME gas steam boiler high efficiency super heater

 

Specification:

China ASME gas steam boiler high efficiency super heater.In power station boilers, the effect of superheaters is to heat the steam to certain temperature for higher efficiency of the power station. China supplier hot boiler spare parts super heaters are steam superheaters to reheat the over-worked long-pressure or middle-pressure steam to certain temperature. The use of rehearters can further improve heat power of the power station circulating and control the steam temperature of the end blades of the steam turbine within allowed range. Zigzag superheaters and reheaters of the Company are also unique with rigorous production technique, first-class production flow line and complete test methods. This is the introduction of China ASME gas steam boiler high efficiency super heater.

 



Introduction:

 

Super heaters are the one of the most important boiler sapre parts that improves the thermal efficiency. High temperature steam boiler radiant super heater is usually applied in high pressure power plant boiler. 

In the boiler, the role of super heater is to heat the saturated steam to a certain temperature of superheated steam to increase power plant efficiency. Repeater essentially further improves the thermal power plant cycle efficiency.

Steam Super heater Coils: Super heater coils are used in a boiler to generate saturated steam. The super heater coils are specially used in Boilers of Power plant. We manufacture Super heater coils in various grades of Alloy steel and in stain less steel tubes with or without support & Header as per customer's drawing.


 

Application:

With the artistic appearance and accurate size, the advance process for bending tube and welding,the first rate test equipment and sophisticated technology.

Features:

As outstanding features, zigzag typed tube boiler pressure parts superheater for coal fired boiler have beautiful appearance, accurate sizes, advanced bending and welding technique, first-lass testing equipment and guaranteed quality.

 

Other products:

 

 

Our company:

 

Shandong Hengtao Group, founded in 1995, is located in Gaomi City, Shandong Province. Hengtao Group has 470,000,000 RMB of total registered capital, 1,400,000 square meter of land coverage, about 2000 employees and over 3 billion RMB of total assets.

We are one of the manufacturers of boiler and boiler parts in China. We have a team of engineers who have more than 20 years’ experience in designing, manufacturing, engineering, supplying of boiler and its spare parts. We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, H-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.

Work shop:

 

Quality Control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety

 

Clients visits:

 

 

 

FAQ:

 

Q1: Which port is closest to your location?

A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.

 

Q2: How about your delivery time?

A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.

 

Q3: Do you offer overseas installation service?

A: Yes, we can send engineers or welders to help installation at site.

 
  • Email to this supplier
  • To :
    sunny  |  Shandong Hengtao Energy Group
  • *Subject :
  • Quantity Order:
  • *Message :

  • Your message must be between 20-2000 characters
  • + Add attachments :
    Select File  (Max 2 files) 
  •  Please enter your company name:

    Please make sure your company name is entered correctly.

  • * Please enter your email address:

    Please make sure your email address is entered correctly.

  • * Please enter your mobile phone:

    (+)   - 

    Please make sure your mobile phone is entered correctly.

Verified Supplier - Shandong Hengtao Energy Group Bussiness Type:  Manufacturer,Trading Company
Scale:  501 - 1000 People
Country/Region:  China (Mainland)/Asia
Established: