Brand Name: Changzhou Green
Model Number: 3525V 4535V pump
Place of Origin: Jiangsu, China (Mainland)
Vickers series vane Pump V & VQ double hydraulic pump
(F3-) |
25V |
19 |
A |
-1 |
C |
-18 |
-(LH) |
Note |
Series |
Displacement |
Port connections |
Shaft type |
Outlet Positions |
Design number |
Rotation |
No-marking: Petroleum series oil Emulsification fluid Water glycol-fluid
F3:Phoshate ester fluid |
20V |
2,3,4,5,6,7,8,9,10,11,12,14 |
A-SAE 4-bolt flange |
1-Str key 86-HD Str key 11-Spline |
(Viewed from shaft end of pump) Outlet Opposite inlet Outlet Inline with inlet Outlet 90°CW from inlet Outlet 90°CW from inlet |
22 |
(Viewed form shaft end of pump)
Left hand for counter clockwise
Right hand for clockwise |
25V |
10,12,14,15,17,19,21,25 |
||||||
35V |
21,25,30,32,35,38,45 |
||||||
45V |
42,45,50,57,60,66,75 |
Series |
Flow code (USgpm) |
Geometric displacement ml/r |
With antiwear hydraulic oil or phosphate eater fluid |
With water glycol fluid |
With water-oil emulsions |
Min. Speed r/min |
|||
Max.operating pressure Mpa |
Max.speed r/min |
Max.operating pressure Mpa |
Max.speed r/min |
Max.operating pressure Mpa |
Max.speed r/min |
||||
20V |
2 |
7.5(0.46) |
13.8 |
1800 |
13.8 |
1500 |
6.9 |
1200 |
600 |
3 |
10(0.61) |
||||||||
4 |
13(0.79) |
20.7 |
15.9 |
||||||
5 |
16.5(1.01) |
||||||||
6 |
19(1.16) |
||||||||
7 |
23(1.40) |
||||||||
8 |
27(1.67) |
||||||||
9 |
30(1.85) |
||||||||
10 |
32(1.95) |
||||||||
11 |
36(2.20) |
||||||||
12 |
40(2.44) |
15.9 |
13.8 |
||||||
14 |
45(2.78) |
13.8 |
|||||||
25V |
10 |
32.5(1.98) |
17.2 |
1800 |
15.9 |
1500 |
6.9 |
1200 |
600 |
12 |
39(2.38) |
||||||||
14 |
45(2.78) |
||||||||
15 |
47(2.89) |
||||||||
17 |
55(3.36) |
||||||||
19 |
60(3.66) |
||||||||
21 |
67(4.13) |
||||||||
25 |
81(4.94) |
||||||||
35V |
21 |
67(4.13) |
17.2 |
1800 |
15.9 |
1500 |
6.9 |
1200 |
600 |
25 |
81(4.94) |
||||||||
30 |
97(5.91) |
||||||||
32 |
101(6.16) |
||||||||
35 |
112(6.83) |
||||||||
38 |
121(7.37) |
||||||||
45 |
147(8.95) |
13.8 |
13.8 |
||||||
45V |
42 |
138(8.41) |
17.2 |
1800 |
15.9 |
1500 |
6.9 |
1200 |
600 |
45 |
147(8.95) |
||||||||
50 |
162(9.85) |
||||||||
57 |
181(11.05) |
||||||||
60 |
193(11.75) |
||||||||
66 |
212(12.93) |
||||||||
75 |
237(14.46) |
13.8 |
13.8 |
Vickers series vane Pump V & VQ double hydraulic pump
Payment term:
1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment
2. L/C at sight
Trade term: EXW or FOB Ningbo/Shanghai
Packing details:
*Eternal Brand, Neutral or Customer’s requires label
*Neutral carton or same as the Customer’s requires, export standard carton
*All cartons should be packed into the pallets more carefully.
*All of the productions are inspected carefully one by one by QC before delivery.
Delivery time:
We have huge quantity of inventory for complete pumps, kits and some pare pats, so the leading time is within 3days if have inventory. If haven’t, within 5days if the quantity is less than 300pcs.
It depends on the quantity ordered.
Min. Order:
*If the model is in common or the production are in our stock warehouse, No MOQ for stocking production.
* Larger quantity, price will be more favorable.