Brand Name: SANHENG
Model Number: SRTX2
Place of Origin: Zhejiang, China (Mainland)
Thermostatic Expansion Valve For Condensing Unit
1.Interchangeable Orifice is easy to store and maintain
2.Wide range of evaporating Temperature
Product Introduction
Thermostatic expansion valve regulate the flow rate of refrigerant into evaporators according to its degree of superheat.
Both the internal equalizer and external equalizer systems are furnished, especially, the external equalizer type efficiently eliminates the influence resulted from the loss evaporator pressure.
Specification
Model |
Equalization |
Connection Type |
Connection Inlet ×Outlet |
Equalization connection |
Capillary Length(m) |
|
inch |
mm |
|||||
SRT2 |
Internal |
SAE Flare |
3/8”×1/2” |
10×12 |
1/4”(6mm) |
1 |
SRTE2 |
External |
|||||
SRHT2 |
Internal |
ODF Solder |
||||
SRHTE2 |
External |
Ordering Code ( A wide range of refrigerant for selection !!! )
Connection Type |
Equalization |
R12 |
R134A |
R22 |
R404A/R507 |
R407C |
SAE Flare |
Internal |
SRTF2 |
SRTN2 |
SRTX2 |
SRTS2 |
SRTZ2 |
External |
SRTEF2 |
SRTEN2 |
SRTEX2 |
SRTES2 |
SRTEZ2 |
|
ODF Solder |
Internal |
SRHTF2 |
SRHTN2 |
SRHTX2 |
SRHTS2 |
SRHTZ2 |
External |
SRHTEF2 |
SRHTEN2 |
SRHTEX2 |
SRHTES2 |
SRHTEZ2 |
Nominal Refrigerating Capacity (-40°C~+10°C)
Orifice Size |
R22 |
R407C |
R134a |
R404A/R507 |
||||
TR |
KW |
TR |
KW |
TR |
KW |
TR |
KW |
|
0X |
0.15 |
0.5 |
0.16 |
0.5 |
0.11 |
0.4 |
0.11 |
0.38 |
00 |
0.3 |
1.0 |
0.3 |
1.1 |
0.25 |
0.9 |
0.21 |
0.7 |
01 |
0.7 |
2.5 |
0.8 |
2.7 |
0.5 |
1.8 |
0.45 |
1.6 |
02 |
1.0 |
3.5 |
1.1 |
3.8 |
0.8 |
2.6 |
0.6 |
2.1 |
03 |
1.5 |
5.2 |
1.6 |
5.6 |
1.3 |
4.6 |
1.2 |
4.2 |
04 |
2.3 |
8.0 |
2.5 |
8.6 |
1.9 |
6.7 |
1.7 |
6.0 |
05 |
3.0 |
10.5 |
3.2 |
11.3 |
2.5 |
8.6 |
2.2 |
7.7 |
06 |
4.5 |
15.5 |
4.9 |
16.7 |
3.0 |
10.5 |
2.6 |
9.1 |
Remark: Nominal refrigerating capacity is based on the condensing temperature 32°C, evaporating temperature 5°C.
v Pay by T/T, LC
v Customers can choose which payment ways that you accept, paypal is most useful and safe, please don’t refuse
paypal fee when you choose it
v Loading Port: ShangHai or NingBo, China
v Samples are available within 7-10 working days.
v Mass Production Delivery: 20 -50days after sample confirmation